Mainfield Preparation and Transplanting
Land Preparation Ploughing has to be done during summer. 1 or 2 days before ploughing flooding has to be done. Surface of the field should be covered with water. 2.5 cm depth of water should be maintained at the time of puddling.
- Ploughing has to be done during summer.
- 1 or 2 days before ploughing flooding has to be done.
- Surface of the field should be covered with water.
- 2.5 cm depth of water should be maintained at the time of puddling.
| Ploughing has to be done during summer. 1 or 2 days before ploughing flooding has to be done. Surface of the field should be covered with water. 2.5 cm depth of water should be maintained at the time of puddling. Puddling Trimming the Bunds Plastering of Bunds |
Optimum age of seedlings for Transplanting
- Short duration varieties - 18 - 22 days
- Medium duration varieties - 25 - 30 days
- Long duration varieties - 35 - 40 days
Pulling out the seedlings
- Pull out the seedlings to be done at 4th leaf stage.
- Transplanting after 5th and higher order leaf numbers (aged seedlings) will affect the performance of the crop.
| Pulling Out Seedlings Special Technologies for Problem Soils |
Special Technologies for Problem Soils