Agritech Archive
Loading
Text size
Crop guidance, searchable

Agritech Archive

Production · Protection · Nutrients · Water
In here

Source : Agri Tech, 2002

Click on the image to view more details
Amaravathi DamBhavanisagar DamPeriyar Dam
Vagai DamKrishnagiri DamManimuthar Dam
Mettur DamSathanur Dam
Papanasam DamAliyar Dam
Details of Storage Capacity and Opening of Major Reservoirs of Tamil Nadu
ReservoirAreaDate of OpeningCapacity at FRL in MCFTFRL in Feet
Mettur Dam1.Cauvery Delta & Mettur Project 2. Pullambadi Canal, New Kattalai High Canal & Mettur CanalJun 12 Aug 193470120
Bhavani-Sagar1. Arakkankottai and Tandapatti Channel 2. Lower Bhavani ProjectApril 15 Aug 1532800105
Amaravathi1. Main Channel 2. Old ChannelAug.t 1 June 14047110
KrishnagiriMain CanalAug 1166652
Sattanur1.Right Bank 2. Left Bank 3. Second crop under Thirukoilur AyacutOct 17321119
Periyar Dam1. Cumbum Valley & Main canal double crop 2. Main canal single crop 3. Periyar New Extension Area(World Bank Aid)June 1 Aug 15 Sep 1510570152
Vaigai DamThirumangalam MainJune609171
ManiMutharMain canalNov 15511118
Papanasam1. Advance Kar 2. Regular Kar 3. PishnamApril 1 June 1 Oct 15500148
PechiparaiPerunchani Reservoir Radhapuram canalJune 1 June 16445048
ParambikulamAliyar Project 1. Thirumuthy Dam – Main canal / zone 2. Aliyar Basin 3. Parambikulam Main canal II ZoneJuly 1 May 15 Nov 1713408 1744 3864 1340872 60 120 72
Chitharu (I & II)--June 16
Komugi--Oct 1
Manjalaru--Oct 15
Manimukthanadhi--Oct 1
KannyaKumari--June 1
Ponneyar--Sep 1
Source

Written and published by Tamil Nadu Agricultural University, and reproduced here unchanged. The original is at https://agritech.tnau.ac.in/agriculture/water_level.html.

Images, PDFs and interactive tools on the original page were not captured — follow the source link for those.